Macedon Ranges Shire – Malmsbury Bridge Replacement
Project Particulars:
- GR demolished and disposed of an existing bridge
- Used larger crane to position small excavator on island to drive in screw piles
- Install screw piles at either end
- Crane lift for bridge placement
- Screw off HWD cover boards
- FRP decking
- Install two boardwalk approaches
- Leave site clean and tidy