GR placed this bridge onto the abutments only last week on behalf of Joanne at Beveridge Williams , bridge consists of 3 spans (10m, 15m, 6m). Bridge was designed to sit above the MW q100 level. Bridge was made up of HDG I-Beams, Steel bearers and joists, powder-coated posts, with modwood decking and cap-rail. Foundations were concrete with steel head stocks.